Leo Carrillo Upper Crossing Photos

The excavation and removal of the concrete roadway crossing the Arroyo Sequit streambed was removed in the fall of 2015. Work included drilling secant walls with 36 forty foot piles and constructing the abutment walls on either side of the bridge. The two lane bridge was installed in December, 2015. The utility work and paving is expected to be finished in January, 2016.