Leo Carrillo Lower Crossing Photos

Excavation and removal of the concrete roadway crossing the Arroyo Sequit river bed was removed in the fall of 2015. During excavation for the Bridge footings underground water was discovered and due to the Water Boards permit requirements the Lower Crossing work has been postponed until July, 2016.